Location Raubex Construction Client
Musina, Limpopo Province SANRAL

The project’s main purpose is to divert the N1 traffic around the town of Musina.

The project involves the following:

  • construction of three major bridges;
  • construction of two interchanges (including on and off ramps);
  • major earthworks (including large cuttings and fills);
  • layer works and asphalt surfacing;
  • 6 km of secondary roads;
  • storm water and subsoil drains;
  • road furniture finishes (such as guard rails, road signs, and fences); and
  • noise barrier walls.

Other elements of the project include the construction of 30 new houses for the relocation of residents displaced by the project.

 

Gallery